Parking Lot Classifications

🏒
Light Duty
Thickness: 2.5-3 inches
Base Depth: 4-6 inches
Cost Range: $2-5 per sq ft
Traffic Load: Passenger vehicles, light delivery
Applications:
  • β€’Office buildings
  • β€’Retail centers
  • β€’Restaurants
  • β€’Medical facilities
🏬
Medium Duty
Thickness: 3-4 inches
Base Depth: 6-8 inches
Cost Range: $3-6 per sq ft
Traffic Load: Regular delivery trucks, buses
Applications:
  • β€’Shopping centers
  • β€’Schools
  • β€’Warehouses
  • β€’Mixed-use developments
πŸš›
Heavy Duty
Thickness: 4-6 inches
Base Depth: 8-12 inches
Cost Range: $4-8 per sq ft
Traffic Load: Heavy trucks, frequent loading
Applications:
  • β€’Truck stops
  • β€’Industrial facilities
  • β€’Distribution centers
  • β€’Airports

Design Standards

πŸ“Space Dimensions
Standard parking space sizes and layout requirements
  • β€’Standard space: 9' Γ— 18' minimum
  • β€’Compact space: 8' Γ— 16' (max 20% of total)
  • β€’Accessible space: 8' + 5' access aisle
  • β€’Van accessible: 8' + 8' access aisle
πŸ›£οΈDrive Aisles
Traffic circulation and maneuvering space
  • β€’90Β° parking: 24' aisle width minimum
  • β€’60Β° parking: 18' aisle width
  • β€’45Β° parking: 13' aisle width
  • β€’One-way traffic: 12' minimum width
β™ΏADA Compliance
Accessibility requirements and standards
  • β€’1 accessible space per 25 spaces
  • β€’1 van space per 6 accessible spaces
  • β€’Maximum 2% slope in any direction
  • β€’Accessible route to building entrance
πŸ’§Drainage Design
Water management and stormwater control
  • β€’Minimum 1% slope for surface drainage
  • β€’Maximum 5% slope for safety
  • β€’Storm drains every 300-400 feet
  • β€’Catch basins at low points

Striping & Marking Specifications

Parking Spaces

Specifications:
  • β€’4-inch wide yellow or white lines
  • β€’Retroreflective paint or thermoplastic
  • β€’90Β° spaces: 9' Γ— 18' minimum
  • β€’Angled spaces: adjust length accordingly
Maintenance:

Restripe every 18-24 months

Fire Lanes

Specifications:
  • β€’Red curbing or pavement marking
  • β€’20-foot minimum width
  • β€’'NO PARKING FIRE LANE' text
  • β€’Clear access to building entrances
Maintenance:

Touch up as needed

Directional Arrows

Specifications:
  • β€’White thermoplastic arrows
  • β€’24-inch length standard
  • β€’One-way traffic indicators
  • β€’Placed at aisle entrances
Maintenance:

Replace when worn

Handicap Symbols

Specifications:
  • β€’Blue and white accessibility symbol
  • β€’Placed in center of space
  • β€’3' Γ— 3' minimum size
  • β€’International symbol of access
Maintenance:

Touch up annually

Maintenance Schedule

Monthly

Year-round
  • βœ“Inspect for damage or safety hazards
  • βœ“Clean debris from drains
  • βœ“Check lighting and signage
  • βœ“Remove snow and ice (seasonal)

Annually

Spring/Fall
  • βœ“Crack sealing and patching
  • βœ“Line striping touch-ups
  • βœ“Drainage system cleaning
  • βœ“Pavement condition assessment

3-5 Years

Ideal weather
  • βœ“Sealcoat application
  • βœ“Complete restriping
  • βœ“Major crack repairs
  • βœ“Drainage improvements

15-20 Years

Major project
  • βœ“Overlay or reconstruction
  • βœ“Base repair if needed
  • βœ“Complete redesign consideration
  • βœ“Upgrade to current codes

Cost Factors

Site Size

Major Impact

Larger lots benefit from economies of scale, reducing per-square-foot costs

Soil Conditions

High Impact

Poor soils require additional base preparation or soil stabilization

Drainage Requirements

High Impact

Storm water management can add 20-40% to project cost

Striping & Signage

Medium Impact

Professional striping adds $0.50-1.50 per square foot

Lighting Installation

Medium Impact

New lighting systems significantly increase total project cost

Permitting

Low Impact

Plan review and permits typically 2-5% of construction cost