Professional Asphalt Tips

Expert advice from experienced contractors and paving professionals

Installation Best Practices

🌑️Temperature Management
Monitor asphalt temperature throughout the process
  • β€’Maintain mix temperature between 275-325Β°F during transport
  • β€’Pave when air temperature is above 50Β°F and rising
  • β€’Use thermal cameras to monitor mat temperature
  • β€’Adjust paving speed based on ambient conditions
🎯Compaction Excellence
Achieve proper density for long-lasting pavement
  • β€’Begin rolling immediately behind paver while asphalt is hot
  • β€’Use vibratory rollers for base course, static for surface
  • β€’Maintain roller speed at 3-5 mph for optimal results
  • β€’Test density with nuclear gauge or core samples
πŸ”—Joint Construction
Create seamless, watertight joints
  • β€’Cut back vertical edge of existing pavement if needed
  • β€’Apply tack coat to all contact surfaces
  • β€’Use infrared heaters to warm existing edge
  • β€’Compact joints immediately for proper bonding
βœ…Quality Control
Monitor critical parameters throughout paving
  • β€’Check mix gradation and asphalt content regularly
  • β€’Monitor compaction with density testing
  • β€’Inspect for segregation, raveling, or other defects
  • β€’Document temperatures, weather, and any issues

Mix Design Considerations

πŸͺ¨Aggregate Selection

  • β€’Use angular, crushed aggregates for better stability
  • β€’Ensure proper gradation for workability and strength
  • β€’Minimize flat and elongated particles
  • β€’Control moisture content in aggregates

πŸ›’οΈAsphalt Binder

  • β€’Select grade based on climate and traffic
  • β€’Consider polymer modification for heavy traffic
  • β€’Maintain proper binder content for durability
  • β€’Use performance-graded (PG) binders when specified

βš—οΈMix Properties

  • β€’Target 4% air voids in compacted mix
  • β€’Ensure adequate VMA (voids in mineral aggregate)
  • β€’Control fines content to prevent bleeding
  • β€’Verify Marshall or Superpave design criteria

Maintenance Timeline

Preventive Maintenance

Years 0-5
βœ“Apply sealcoat every 3-5 years
βœ“Fill cracks annually in spring
βœ“Clean surface debris regularly
βœ“Inspect and clear drainage systems

Corrective Maintenance

Years 5-15
βœ“Patch localized failures promptly
βœ“Apply overlay if surface is worn but base is sound
βœ“Improve drainage where needed
βœ“Consider milling and resurfacing for extensive wear

Rehabilitation

Years 15+
βœ“Full-depth reconstruction for structural failure
βœ“Reclaim and stabilize existing materials when possible
βœ“Upgrade design for current traffic loads
βœ“Improve subgrade and drainage systems

Troubleshooting Common Issues

Premature Cracking

Common Causes:

  • Γ—Inadequate base support
  • Γ—Poor drainage
  • Γ—Overloading
  • Γ—Temperature cycling

Prevention:

  • βœ“Proper base design and construction
  • βœ“Install adequate drainage
  • βœ“Control load limits
  • βœ“Use appropriate asphalt grade

Raveling

Common Causes:

  • Γ—Low asphalt content
  • Γ—Segregation during paving
  • Γ—Poor compaction
  • Γ—Weather exposure

Prevention:

  • βœ“Maintain proper binder content
  • βœ“Prevent segregation in transport and paving
  • βœ“Achieve adequate compaction
  • βœ“Apply fog seal if needed

Rutting

Common Causes:

  • Γ—Inadequate mix stability
  • Γ—Excessive loading
  • Γ—High temperatures
  • Γ—Poor aggregate quality

Prevention:

  • βœ“Design stable mix with proper gradation
  • βœ“Control traffic loads
  • βœ“Use polymer-modified binders
  • βœ“Select quality angular aggregates

Bleeding

Common Causes:

  • Γ—Excess asphalt binder
  • Γ—High temperatures
  • Γ—Low air voids
  • Γ—Inadequate aggregate structure

Prevention:

  • βœ“Optimize binder content
  • βœ“Design for climate conditions
  • βœ“Achieve proper compaction
  • βœ“Use adequate coarse aggregate