Roads & Streets
Comprehensive guide to asphalt road and street construction and maintenance
Road Classifications
ποΈResidential Streets
Thickness: 3-4 inches
Base Depth: 6-8 inches
Traffic Load: Light to Medium
Design Life: 15-20 years
Applications:
- β’Neighborhood streets
- β’Cul-de-sacs
- β’Local access roads
π£οΈCollector Roads
Thickness: 4-6 inches
Base Depth: 8-12 inches
Traffic Load: Medium to Heavy
Design Life: 20-25 years
Applications:
- β’Arterial connectors
- β’Commercial access
- β’Bus routes
π€οΈMajor Arterials
Thickness: 6-8 inches
Base Depth: 12-18 inches
Traffic Load: Heavy
Design Life: 25-30 years
Applications:
- β’Main thoroughfares
- β’Commercial corridors
- β’Transit routes
πΈHighways
Thickness: 8-12+ inches
Base Depth: 18+ inches
Traffic Load: Very Heavy
Design Life: 30+ years
Applications:
- β’Interstate highways
- β’State routes
- β’High-speed corridors
Design Criteria
πTraffic Analysis
Determining design traffic loads and patterns
- β’Average Daily Traffic (ADT)
- β’Design Hourly Volume (DHV)
- β’Truck percentage and loading
- β’Equivalent Single Axle Loads (ESALs)
- β’Growth projections over design life
ποΈStructural Design
Pavement thickness and layer specifications
- β’Subgrade strength (CBR testing)
- β’Base course material selection
- β’Asphalt layer thickness design
- β’Load distribution calculations
- β’Fatigue and rutting analysis
πGeometric Design
Roadway alignment and cross-section design
- β’Lane width and number of lanes
- β’Shoulder width and type
- β’Crown and superelevation
- β’Sight distance requirements
- β’Intersection design
π§Drainage Design
Surface and subsurface water management
- β’Surface drainage and grading
- β’Storm sewer system design
- β’Subsurface drainage layers
- β’Culvert and bridge drainage
- β’Erosion control measures
Construction Process
ποΈ
Site Preparation
1-2 weeks
- β’Survey and staking
- β’Utility relocation if needed
- β’Clearing and grubbing
- β’Earthwork and grading
- β’Environmental controls
πͺ¨
Base Construction
1-3 weeks
- β’Subgrade preparation and testing
- β’Base course placement
- β’Compaction and density testing
- β’Proof rolling for weak areas
- β’Grade verification
π£οΈ
Asphalt Paving
3-7 days
- β’Tack coat application
- β’Hot mix asphalt placement
- β’Compaction operations
- β’Joint construction
- β’Quality control testing
β
Finishing
1-2 weeks
- β’Pavement marking installation
- β’Sign installation
- β’Guardrail and safety features
- β’Landscaping and restoration
- β’Final inspection and acceptance
Maintenance Strategies
Preventive Maintenance
Years 0-8
Cost: Low
Extends pavement life significantly
βCrack sealing
βFog seals and slurry seals
βMicrosurfacing
βPothole patching
Corrective Maintenance
Years 8-15
Cost: Medium
Restores structural capacity
βSurface recycling
βThin overlay (1-2 inches)
βMilling and resurfacing
βBase repair in localized areas
Rehabilitation
Years 15-25
Cost: High
Major life extension
βThick overlay (3+ inches)
βFull-depth reclamation
βReconstruction of failed sections
βStructural improvements
Reconstruction
Years 25+
Cost: Very High
New facility design life
βComplete reconstruction
βUpgraded design standards
βImproved drainage systems
βEnhanced safety features
Quality Control Testing
Test Type | Frequency | Specification | Purpose |
---|---|---|---|
Density Testing | Every 500 tons | β₯ 96% Marshall density | Ensure proper compaction |
Thickness Testing | Every 1000 tons | Β±0.25 inches of design | Verify design thickness |
Temperature Monitoring | Continuous | 275-325Β°F at paver | Proper mix workability |
Smoothness Testing | Each lane mile | IRI < 63 inches/mile | Ride quality assurance |